Work done today
-
- 998 Cooper
- Posts: 408
- Joined: Sat Sep 12, 2015 7:40 pm
- Location: Lancashire
- Been thanked: 1 time
Work done today
Floor insulation fitted ready for trimming.
You do not have the required permissions to view the files attached to this post.
- Nick W
- 1275 Cooper S
- Posts: 2892
- Joined: Sat Jan 17, 2015 8:59 pm
- Location: sheffield
- Has thanked: 1 time
- Been thanked: 8 times
Re: Work done today
looks a great job so far
what carpet are you fitting....veltone?
![Smile :)](./images/smilies/icon_e_smile.gif)
what carpet are you fitting....veltone?
Up North in Sheffield
-
- 998 Cooper
- Posts: 408
- Joined: Sat Sep 12, 2015 7:40 pm
- Location: Lancashire
- Been thanked: 1 time
Re: Work done today
Thanks.
I am fitting a set from BAS in black veltone, it was the nearest to the original that I could find.
They set is slightly oversize which is good for trimming back to achieve a snug fit.
I am fitting a set from BAS in black veltone, it was the nearest to the original that I could find.
They set is slightly oversize which is good for trimming back to achieve a snug fit.
-
- 1275 Cooper S
- Posts: 1440
- Joined: Sat Dec 27, 2014 1:41 pm
- Location: Oldbury west midlands
Re: Work done today
looks good,
I fitted BAS black veltone in my mk2 998 cooper, very pleased with it, needed a little trimming but was a pretty good fit, also looks correct which is important.
I fitted BAS black veltone in my mk2 998 cooper, very pleased with it, needed a little trimming but was a pretty good fit, also looks correct which is important.
-
- 998 Cooper
- Posts: 502
- Joined: Thu Jun 24, 2010 10:50 pm
- Location: Sunny Devon
- Has thanked: 1 time
-
- 998 Cooper
- Posts: 408
- Joined: Sat Sep 12, 2015 7:40 pm
- Location: Lancashire
- Been thanked: 1 time
Re: Work done today
Fitted servo and connected pipes today, bleeding brakes tomorrow.
You do not have the required permissions to view the files attached to this post.
-
- Site Admin
- Posts: 19846
- Joined: Thu Jun 24, 2010 11:30 am
- Location: Away with the Faries
- Has thanked: 3 times
- Been thanked: 8 times
Re: Work done today
Nice pipe work!
I hope you have more joy with your Servo than I did on the Speedwell car it was pissing brake fluid out within 3 days of being fitted.
I hope you have more joy with your Servo than I did on the Speedwell car it was pissing brake fluid out within 3 days of being fitted.
-
- Site Admin
- Posts: 19846
- Joined: Thu Jun 24, 2010 11:30 am
- Location: Away with the Faries
- Has thanked: 3 times
- Been thanked: 8 times
Re: Work done today
Update on my dogey servo.
It was all down to me. Apparently ALL unions need to be tightened up before bleeding. This appears to be a non optional part of the process!
Strangely enough, my servo works perfectly now!
![Embarrassed :oops:](./images/smilies/icon_redface.gif)
It was all down to me. Apparently ALL unions need to be tightened up before bleeding. This appears to be a non optional part of the process!
Strangely enough, my servo works perfectly now!
![Embarrassed :oops:](./images/smilies/icon_redface.gif)