Well its about time I added some updates to this thread especially as we've still been cracking on with the project. So to bring you guys up to date here's what’s been going on.
First off the underside rear end of the car was to be addressed
When taking the subframe off unfortunately the rust has gone too far to re-use again as this is the state of it on both sides. So replacement has been sourced.
Then there was some further rust that required some chopping of the floor on both sides
These areas were then plated over.
So with the floor looking in good shape it was time for some protection....
..so as with the rest of the floor a coat of POR15 was applied for rust protection in the future.
Rear arches have been addressed
This is where work is still on-going and at the rear end of the car including fitting the new rear valence and joining existing seams.
In addition to the bodywork the engine has had some attention. As mentioned earlier in the thread the cylinder head was sent off for unleaded seats and this has been returned and re-built.
So with the bottom end of the engine, first off all the ancillary parts were removed and all the old paint was stripped off the surfaces as can be seen below.
Once this was done the clutch was removed and checked and there’s loads of life left in it so that was re-instated. Also new timing chain was added.
All the ancillary parts were stripped down to bare metal and then re-painted.
Then the engine was painted with a zinc based primer before the top coat was applied. (note the rear breather was removed and replaced with a blank plate as the engine number dictates)
And this is the current state of the engine. Still a few more bits to add including the badge plates, engine number and thermostat etc but certainly looking a lot better than when it was removed from the car.
So that’s the current state of play but still plenty to be cracking on with